On this coil crane, the motor-driven cable drums required a lot of maintenance.
In this process crane there was a number of required cables and less space available.
Six transport trolleys move material through the individual stations in this galvanization plant.
Reliable energy supply for crane and gantry travel in waste sorting operations.
In halls in particular, every little bit of space often counts.
This crane is to be used in a sawmill to transport up to 8 cubic metres of wood chips at once.
These three cranes are used to transport containers with liquid metal in a casting house.
In this case, two different crane applications have been realised using the igus® Energy Chain® series 5050 from the E4/4 range
This crane in a truck assembly plant is used to unload andtransport the individual vehicle chassis at the beginning of the assembly process.
With the perfectly fitting energy supplysystem for this crane system, the overalldimension for the installation was considerablyreduced.
Location: Austria
Travel: 24 m
Speed max.: 45 m/min
Acceleration max: 0.5 m/sec²
energy chain®: 4040CR.20.250.0
chainflex® Types: CF31 / CF6 / CF11
Location: Germany
Travel: 38 m
Speed max.: 50 m/min
Acceleration max: 0,5 m/sec²
energy chain®: 3838.25.250.0
chainflex® Types: CF31 / CF130 / CF11 / CFBUS
Location: Europe
Travel: 160 m
Speed max.: 20 m/min
Acceleration max: 0,5 m/sec²
e-chain®: 4140.22.250.0
chainflex® Types: CF30 / CF7 / CF11
Location: Europe
Travel: 28,6 m
Speed max.: 80 m/min
Acceleration max: 0,3 m/sec²
energy chain®: 400.25.300.0
chainflex® Types: CF30 / CF31
Your contact
Theo Diehl +49 6162 6808 Your requirements?