Improve technology and reduce the costs -
50 Examples for readychains® assembled e-chainsystems® online

For years the igus® motto has been "plastics for longer life®". By this we mean the production of innovative plastic products which reduce maintenance work, achieve technical improvements, at the same time as reducing costs and increasing service life, everything delivered immediately from stock.

Improve the technology of your application and increase cash flow quickly with ReadyChains® assembled E-ChainSystems®

7 out of 50 practical examples
Read more  

Rough environment, high speed

Christoph Gschoßmann, Kaspar Walter GmbH & Co. KG

"Ten years ago we still had a much higher level of manufacturing depth. That is no longer appropriate for the times. Nowadays we look for partners in the market who are specialists in their sector like igus®."

Read more  

Quality and highest precision

Peter Bünter, Kündig Control Systems

"Due to preassembly, the savings amount to three figures. We also no longer check goods inwards, but instead trust the igus® protocol that every product is included."

Read more  

Collaboration even in the development phase

Hans-Jürgen Gizler, Alzmetall GmbH

"We first used "ReadyChain®" cable packages and energy chains from igus on the GS 800. The collaboration proved successful, so the GS 650 is also equipped with "ReadyChain®" energy supply systems."

Read more  

Less room, chips and dust

Theo Sudholt, Weeke Bohrsysteme GmbH

"Based on our good collaboration, we opted for the preassembled system in order to reduce throughput times."

Read more  

Rugged, safe and UV resistant

Horst Baasch, Trierer Aufzugbau Baasch & Diding GmbH

"The advice was outstanding, the product was right, the deadline was right, as was the agreed price. What more can you ask!"

Read more  

Reduced electrical installation time

Merten Hamann, Bargstedt Handlingsysteme

"By the application of the preassembled energy supply systems, we have almost halved the electrical installation time."

Read more  

Higher service lives

Erich Schmid, INDEX-Werke GmbH & Co. KG.

"Together with igus®, we have come up with a solution that exactly matches our requirements on site. In doing so, preassembly worked out for us from day one. “

Here you can find many more customer examples with ReadyChains®

Increase service life, reduce maintenance costs, save costs and find customer applications about many more subjects from all product areas here.

Industry sector:
Case of application / Presentation of problem:


QuickPin 2.0

Connector-cable configurator

Select in only 3 minutes over 750 Chainflex® cables and 3000 connector components, configure cable online, order directly and generate ePLAN electric P8 macro.

Fast selection using parameters or manufacturer part number

Intuitive operation with mouse and drag & drop

Transfer configured cable into the shopping cart and enquire, order or mark it for ordering later

Prices immediately shown online, including copper surcharge

Free delivery of an ePLAN electric P8 macros with order

Connector/cable solution at one stop

Go to Configurator  

We would also like to show you technical innovations for your application


Contact
Other contact options

+49 (0) 2203-9649-0
Send e-mail to igus®
igus® contact
Back to the top