Assembly instructions for energy chain system E6.1

System E6.1 assembly

Remove the opening cross bars by hand or screw driver. Repeat the process on the lower side

 
System E6.1 assembly

Disassemble a total of 2 opening cross bars on each side to complete the separation

 
System E6.1 assembly

Push the connection pin out using a screw driver. Repeat the process on the opposing side

 

System E6.1 assembly

Rotate the energy chains apart until the interlocks between the chain links disengage. Repeat the process on the opposing side

 

More than 100,000 products available! Delivery and consultation Mon-Fri from 7am-8pm and Sat from 8am-12pm!


Contact
Other contact options

+49 (0) 2203-9649-0
Send e-mail to igus®
igus® contact
Back to the top