Assembly instructions for E-ChainSystem® E4.1

E4.1 Assembly - joining two individual meter sections

 

E4.1 - Replacing an individual chain link in an assembled energy chain

 

Assembling E-Chains® and E-Tubes

System E4.1 assembly

Remove the cross bars from the first three links and then join them together at both ends.

 
System E4.1 assembly

Assemble crossbars - Push down and snap in by using a screwdriver

 
System E4.1 assembly

Assemble clips (E-Chains® with crossbars every other link) - Push down and snap in

 
System E4.1 assembly

Assemble E-Tube lids/bottoms - Attach to the connector at an angle - Snap in

 

Separating E-Chains® and E-Tubes

System E4.1 disassembly

Remove crossbars, clips, lids and bottoms at the outer links…

 
System E4.1 disassembly

...guide the screwdriver into the slot between side links and release it by levering …

 
System E4.1 disassembly

..remove the outer links to the side…

 
System E4.1 disassembly

...and separate the E-Chain®

 

Opening E-Chains®

System E4.1 assembly

Remove crossbars - Insert screwdriver into the slot, push down, release by lever action

 
System E4.1 assembly

Remove clips - Insert screwdriver into the slot and push down, release by lever action

 

Opening E-Tube

System E4.1 assembly

Remove lids/bottoms - Insert screwdriver into the slot, release by lever action

 
System E4.1 assembly

Release only one side to swivel the lid!

 

More than 100,000 products available! Delivery and consultation Mon-Fri from 7am-8pm and Sat from 8am-12pm!


Contact
Other contact options

+49 (0) 2203-9649-0
Send e-mail to igus®
igus® contact
Back to the top