DryLin® W - Installation instructions

Tightening sequence of the screws

 
Installation instructions for DryLin® W rail with housing bearings:

During the installation process, a compressive force of minimum 50 N is recommended on the centre of the mounting surface. Alternatively, a plastic hammer/soft face hammer can be used during and after the mounting to align the bearing.

Tightening torque:
W-06: M4 = 1.5 Nm
W-10: M6 = 6.0 Nm
W-16: M8 = 15.0 Nm
W-20: M8 = 15.0 Nm

Installation instructions for DryLin® W rail with complete slide system:

Tightening sequence of the screws

 

During the installation process, a compressive force of minimum 50 N is recommended on the centre of the mounting surface. Alternatively, a plastic hammer/soft face hammer can be used during and after the mounting to align the bearing.

Tightening torque:
W-06: M4 = 1.5 Nm
W-10: M6 = 6.0 Nm
W-16: M8 = 15.0 Nm
W-20: M8 = 15.0 Nm

 

More than 100,000 products available! Delivery and consultation Mon-Fri from 7am-8pm and Sat from 8am-12pm!


Contact
Other contact options

+49 (0) 2203-9649-0
Send e-mail to igus®
igus® contact
Back to the top