Largest worldwide
Sludge treatmentThe largest plastic e-chain® in the world, the
E4.350 as part of the Amoras project, is used for
this application. It has an inner height of 35 centimetres
and is available with inner widths up to
1,000 millimetres. Thanks to e-chain® design
with integrated rolls the required drive force for
the chain is maximally reduced. The Amoras
project is one of the biggest sludge treatment facilities
worldwide. Brackwater from the Port of
Antwerp is routed into the large tanks and the
sludge is suctioned off by pumps on the bridge
for treatment. The pumps can be moved over
the whole bridge length of 150 metres. The heavy
hoses (approx. 100 kg per metre) have to be
routed safely and protected from mechanical
abrasion on the bridge. The entire plant is in use
round the clock without having to be maintained.
Sereant, Joury Van Gijseghem,