E4.1 Assembly - joining two individual meter sections
E4.1 - Replacing an individual chain link in an assembled energy chain
Remove the cross bars from the first three links and then join them together at both ends.
Assemble crossbars - Push down and snap in by using a screwdriver
Assemble clips (E-Chains® with crossbars every other link) - Push down and snap in
Assemble E-Tube lids/bottoms - Attach to the connector at an angle - Snap in
Remove crossbars, clips, lids and bottoms at the outer links…
...guide the screwdriver into the slot between side links and release it by levering …
..remove the outer links to the side…
...and separate the E-Chain®
Remove crossbars - Insert screwdriver into the slot, push down, release by lever action
Remove clips - Insert screwdriver into the slot and push down, release by lever action
Remove lids/bottoms - Insert screwdriver into the slot, release by lever action
Release only one side to swivel the lid!
More than 100,000 products available! Delivery and consultation Mon-Fri from 7am-8pm and Sat from 8am-12pm!