Safe application of the tunnel boring machine with assistance from igus® E-Chain®

Herrenknecht, Germany

Industry: Tunneling machine

E-Chain®: 840.30.450.0

Travel: 14 m

Speed: slow

Acceleration: slow

Filling: Crane: approx. 8.5 kg/m


Tunnel boring in defined sections with the assistance of an igus® E-ChainSystem®, which guides the essential hose cables section by section.

Tunnel construction  
More on applied products here
Further interesting applications from extremely diverse areas can be found here.

Contact
Other contact options

+49 (0) 2203-9649-0
Send e-mail to igus®
igus® contact
Back to the top